conducted services:

  • Construction of a monitoring grid with 14 simultaneous measuring points
  • recording the acceleration behaviour  of the air column as well as calculation of the actual friction coefficient. 
  • air velocity measurement in the main tunnel tube with simultaneous measurement of supply air and exhaust air over the ramps.

Auftraggeber:
ASFiNAG / Land OÖ